Curriculum Vitae of Dr. Eman ROHAYEM

Professional info
Name: Eman Bassiouny Youssef ROHAYEM
Date of Birth: 02-21-1977
Mobile No: (+49)15204209777
Address: App. 46, Halmhuberstrasse 10-14, 68219 Mannheim, Germany
Nationality: Egyptian
Marital Status: Single
Gender: Female
E-mail Address: eman.bassiouny@consultant.com/e_basuony@yahoo.com
Residence Permit in Germany: Up to 29-01-2015, No.D41259110
Work Permit: No.07932582
Career Objective
-
Seeking a challenging job with a dynamic, highly reputable multinational/national company where my experience, qualification, communication and interpersonal skills can be utilized and developed as well as further build on my experience. I possess the skills to work in a project management, quality auditing, engineering auditing, technical, technology, procurement, commercial area, and/or research & development.
-
I am capable of adapting to a challenging role. I am willing to give a total support to the organization that I will work for in order to achieve its goals and creating mutual benefits.
-
I am interested to work in European market and to live in Germany, therefore, I will start learning German and I plan to be fluent in this language in a short time as I am fast learning and self-motivated.
Key skills
-
The ability to research and analyze data quickly and learn rapidly, not depending on judgment but factual information.
-
The ability to analyze outside existing boundaries to identify implications and learn from others.
-
The creativity to propose innovative solutions.
-
The ability to manage uncertainty within complex environments to produce workable solutions.
-
The courage and self-confidence to solve unfamiliar problems.
-
Having the ability to work efficiently with others in a team.
-
Understanding and approaching technical/commercial issues coupled with an enthusiasm for technical/commercial challenges.
-
Having the ability to simplify the business needs/project ideas, strategies, data, knowledge and present them to the upper level of the managements or the clients.
-
Having the capability to merge at any role easily if an orientation/training session is taken.
-
-
Education
2013– 2013
Project Management Professional (PMP) Certified, PMP Number: 1652211
2012 – 2008
AL-AZHAR UNIVERSITY, Cairo, Egypt
Ph.D. degree in Electrical Power Engineering
2007 – 2008
AIN SHAMS UNIVERSITY, Cairo, Egypt
Ph.D. courses and research plan
2006 – 2001
AIN SHAMS UNIVERSITY, Cairo, Egypt
Master degree in Electrical Power Engineering
1995 – 2000
AIN SHAMS UNIVERSITY, Cairo, Egypt
B.Sc. in Electrical Power & Machines Engineering
1992 – 1995
High Secondary School
-
PhD title is “RELIABILITY ASSESSMENT OF ELECTRICAL POWER SYSTEMS WITH DISTRIBUTED GENERATION UNITS”.
The main object of this PhD research described is to demonstrate, analyze the reliability indices of the electric composite systems at the second hierarchal level (HL-II) and evaluate the effect of integrating the distributed generation units such as wind generation farms as a source of green or renewable energy and combined cycle gas turbines (CCGT) as a source of gas fired generation source.
-
Master title is
The main objective of this master research is to realize the benefits that can be obtained when applying the principle of distributed generation (DG) in electrical power systems.
Awards
-
Selected to be considered for inclusion in Who's Who in Science and Engineering, 11th Edition (2011-2012), for my achievements as an engineer and researcher where biographies are included of the world’s most noteworthy people, featuring personal and career histories, education, achievements and memberships.
-
The Best appreciation paper at
-
The best paper awarded at IEEE PES, ISGT, Middle East, (17th-20th December, 2011).
Vocational Experience
More than 10 years with the Oil & Energy Projects
-
Experience developed from working in multinational/international companies and engaging with international projects in electrical engineering and the intervention with different disciplines, coupled with on-job professional experience, have given an analytical approach, solving technical and management challenges while maintaining a practical approach to the solutions.
-
A broad range of industrial, oil and gas projects and specialist technical assignments undertaken; demonstrating willingness and flexibility to handle any task at hand.
-
Excellent knowledge of the international standards and codes is gained from working with different famous clients and consultant offices/companies such as: Aramco, Total, Bechtel, BP, Shell, Technip and Dar-Al Ha
-
Distinguished experience developed from working in EPC/turnkey projects enables me in working at different areas, such as project management, quality control, engineering auditing, /business and technical development, research and development, training , chain of supply and marketing.
-
More than 10 years’ experience in both oil & gas and industrial projects covering engineering, procurement, construction, commissioning, start up, FEED studies, spec. preparation, requisitions, pre-qualification of vendors / contractors, techno-commercial bid evaluation, making recommendations to manage interface between engineering and construction activities.
-
Good communication and personal skills across all levels of management. Having experiences in motivating employees to ensure standards of safety, quality and project commitments.
-
Participate in working at some renewable projects and put the technical specifications/guidelines for the green plant items such as wind energy and photovoltaic.
-
Teach technical courses at some companies such as: Power system analysis and the impact of integrating renewable energy on the power system efficiency and reliability.
-
03/2014-05/2014 Deputy Project Manager/Quality Auditor
Technomatic GmbH, Germany
-
Review the contract, specification and the operations criteria of the different required systems such as: the automation, control, telecommunication, process and electrical systems.
-
Determine the commercial changes/purchase orders which correspond to any engineering changes/deviations.
-
Determine the different types of spare parts.
-
Responsible for coordination the various phases and monitor all team members’ activities during all assignments.
-
Take all the preventive and corrective actions where necessary to keep cost and time as planned.
-
Create the checklists /forms to audit the engineering, procurement and installation phases.
-
Determine the lessons learned to be an input for other similar projects.
12/2012-02/2014 Independent Consultant for Egyptian oil and energy sector
-
Participate and supervise the different phases of the projects starting from the initiation passing through planning, execution, monitoring & controlling and finally close out of the projects.
Review the contract and the scope of the work.
Manage different types of electrical power supplies philosophies including the conventional power plant and renewable power farms/plants.
Control and supervise more than one project at the same time.
Distribute and control the activities between electrical engineers in the different projects.
Prepare specifications, data sheets, supplier document requirements, minimum quality surveillances and application sheets
Review electrical material requisitions.
-
Teaching technical courses and PMP (project management) courses.
11/2011- 11/2012 Technical Team Leader
Baker Hughes, Cairo, Egypt
-
Manage activities of maintenance area to support the production and the operation plan.
-
Develop and manages budget compliance, make recommendations on work place facility and tooling requirements.
-
Coordinate specifications and procurement of capital expenditures.
-
Responsible for planning, coordination and direction of all maintenance operations, up to and including installation of equipment, preventative maintenance and facility/equipment repair to support operations.
-
Ensure competent technical workforce to conduct business.
-
Handle special projects, as assigned.
10/2009- 10/2011 Lead Electrical Engineer (Abuquir/ North Shadawan)
British Petroleum (BP), Cairo, Egypt
Review the contract and the scope of work of electrical /electromechanical duties and all intervention with other disciplines.
Review and confirm existing electrical design philosophy in order to define new electrical facilities for new equipment if needed.
Issue a new design philosophy of feed and detailed stages for new phases in the project include the conceptual layout of the external and internal electrical networks.
Issue and review calculations, specifications, data sheets, material take off and material requisitions for all electrical equipment/systems such as, transformers, switchgear, generators. UPS, distribution panels, feeders, lighting apparatus, earthing systems, explosive materials (if needed), lightning and any required miscellaneous for the installation.
Determine and approve the accepted vendor lists.
-
Review all Purchase Orders, Contracts and Supply Chain activities.
-
Expedite the vendors to maintain the schedule of the project as per contract.
-
Assign the manpower required according to the approvedplan and schedule for project execution time.
-
Coordinate between the other disciplines to ensure that there is no contradiction at any intervention activities and the works are performed perfectly.
-
Approve factory acceptance tests (FATs) and site acceptance tests (SATs).
-
Follow construction activities with the site manager.
Responsible on the training programs for employees at Electrical Department.
09/2008-09/2009 Project Manager Coordinator
El-Sewedy for Wind Generation (SWEG), Cairo, Egypt
-
Analyze and identify the objectives and events of the contact and bidding of the wind farm project in all phases (engineering, procurement and construction).
-
Assess and control risk (or Risk Management) and assess all bottom necks in the initiation and during the contracting stage.
-
Acquire human and material resources.
-
Coordinate with Spanish partnership and implement Spanish code to be adapted with IEC.
-
Assign all the required tasks, which include and not limited to: Plan, execute the project schedule and cost; approve the necessary documents from the authorities; Perform vendor list evaluation; Control the project execution for bidding, Review and approval engineering calculations and drawings; Supervising material procurements and Prepare close-out review report & final Status Report.
-
08/2007 -08/2008 Electrical Power Group Leader
Dar Al-Handasah, Cairo, Egypt
-
Review the contract and the scope of work of electrical /electromechanical duties and all intervention with other disciplines.
-
Control and supervise more than one project at the same time.
-
Distribute and control the activities between electrical engineers in the different projects.
-
Preparation scope of work to be included in the concept report.
-
Ensured that the development drawings are checked and completed in an efficient and timely manner.
-
Attend and participate projects design review meetings.
-
Attend pre award meetings.
-
Participated in the cycle of vendor prints review.
-
Reviewed all drawings prior to release.
-
Prepare/Review the specifications, data sheets, supplier document requirements, minimum quality surveillances and application sheets.
-
Update the revisions of the international codes and state the differences between the new and the older revisions.
10/2001-07/2007 Senior Electrical Engineer
Petrojet Cairo-Egypt
-
Issue design philosophy of feed and detailed stage for the electrical network and all required facilities of the project.
-
Perform all required calculations related to electrical activities of the project (load flow, short circuit, voltage drop, reliability lighting, earthing, and lightning).
-
Issue technical specifications, data sheets, material take off and material requisitions for all electrical equipment/systems including transformers, switchgear, and generators. UPS, distribution panels, feeders, lighting apparatus, earthing systems, explosive materials (if needed), lightning and any required miscellaneous for the installation.
-
Review all vendor detailed drawings concerning cabling activities, lighting activities, earthing and lightning activities.
-
Review all detailed drawings concerning substations activities. This included substation equipment layouts, substation cable routing drawings, substation cable routing details and substation elevation drawings.
-
Prepare bid evaluation reports for the electrical equipment.
-
Designed all drawings associated with the one line diagrams. This included key one line diagrams, elementary single line diagrams.
-
Review the hazardous area classification drawings for the proper selection of the electrical equipment.
-
Provide all possible assistance during construction activities at sites.
-
Responsible on the training programs for Employees at Electrical Dept.
Vocational Training
-
Design consideration of Electric systems (lighting, earthing,) organized by Cairo University.
-
Lightning protection system, organized by Petrotrain Company.
-
Principle and operation of electric motors and generation.
-
Power system Protection organized by Development and Performance Center.
-
The specialization program in materials control, organized by American university in Cairo(AUC), containing the following courses:
1. Project planning and control techniques.
2. Quality control and material testing.
3. Inventory control and material testing.
4. Material and buying proceedings.
5. Primavera applications in material controls.
6. Computer applications in material control.
Electrical Design Packages and Computer Skills
-
Power system professional package (EDSA), for power load flow, short circuit analysis, Voltage drop, capacitor sizing, motor starting, battery sizing, earthing, generator sizing, transformer sizing, reliability analysis and harmonics analysis.
-
ETAP load flow study S.C. calculation, reliability calculation, generator sizing, transformer sizing.
-
Dialux (lighting design software).
-
Doc (cables, bus bar, short circuit analysis and load flow).
-
Microsoft office applications (Word, Excel, Power Point).
-
Microsoft outlook.
-
Minitab (Statistical package).
Language - Arabic and English –Fluent
- I have started learning the basic level of German language in private lessons in Cairo and I intend to continue till the proficiency level.
Publications
I have published & presented papers in some international conferences and Journals, as follows:
-
E. Bassiouny, A. S. Attia, M. A. Badr
-
E. Bassiouny, A. S. Attia, T. S. Abdel-Salam, M. A. Badr
I was awarded the best conference presenter for UPEC 2004.
-
E. Bassiouny, A. S. Attia , T. S. Abdel-Salam, M. A. Badr
-
E. Bassiouny, A. A. Abou El-Ela, S. A. Othman (Impact of Adding Wind Power Generation on the Reliability of a Real Electric Power System at Zafarana Site in Egypt) at the International Steering Committee of 2011 IEEE GCC International Conference and Exhibition for Sustainable ubiquitous technology at Dubai, (19th – 22nd February, 2011, in co-operation with IEEE.
-
E. Bassiouny, A. A. Abou El-Ela, S. A. Othman (Impact of Adding Wind Power Generation on the Reliability of a Real Electric Power System at Zafarana Site in Egypt) at International Journal of Innovations in Electrical Power Systems, 2011.
-
E. Bassiouny, A. A. Abou El-Ela, S. A. Othman (Reliability Cost/Worth Evaluation of Bulk Power System at Zafarana Site in Egypt ) at the International Steering Committee of 2012 IEEE-PES International Conference and Exhibition for Sustainable ubiquitous technology at Jeddah , Kingdom of Saudi Arabia SA (17th – 20nd December, 2011(. I have awarded the best paper.
Memberships
IET Member and Business Partner
IEEE
VDI (The Association of German Engineers)
References
-
Ahmed Hagras: Vice President at BP, Email, Ahmed.Hagras@BP.com,
Mobile: +20(122) 3127157.
-
Sherif Elgebaley: Engineering manager at BP, Email, elgeea@bp.com,
Mobile: +20 (100) 5184970.
-
Heba Moustafa: Project manager at Worley Parsons, Email,Heba.Mostafa@WorleyParsons.com,
Mobile No: +20(127) 3343988.
-
Marwa Ismail: Senior Engineer at Dar El Handasah ,Email,Marwa.Ismail@dargroup.com,
Mobile: +2(100) 5456060.
2010 - present